The City of Rancho Palos Verdes Public Works Department -Residential Streets Improvement Project FY11-12 Areas 3 and 5 The City of Rancho Palos Verdes Public Works Department -Residential Streets Improvement Project FY11-12 Areas 3 and 5

PUBLIC WORKS

RESIDENTIAL STREETS IMPROVEMENT PROJECT FY11-12 AREAS 3 AND 5

Project Summary and Approach

The annual residential streets improvement project includes the resurfacing of the roadways, repairing of sidewalk, curb, gutter, replacing and updating of signage, and refreshing roadway striping in the City’s residential streets.  This project will perform work in both maintenance areas 3 and 5 of the City.  The work will be conducted in two main phases: (1) the initial preparatory work, which includes localized full-depth asphalt repair (for damage due to tree root intrusion and other causes), crack sealing, sidewalk repair, curb and gutter repair, update of ADA-accessible curb ramps, and replacement and updating of traffic signage and (2) the street resurfacing and roadway striping. 

Phase I Project Schedule

Work will begin in February 2013 and continue to Summer 2013:  

  • Click herefor the project schedule and map for Phase I construction work in Area 3 (February – April 2013)
  • Click here for the project schedule and map for Phase I construction work in Area 5 (March – May 2013)
  • Click here for the project schedule for Phase I construction work in Areas 3 and 5 (March 12th to June 7th 2013)

**Please note that these schedules are subject to change due to inclement weather and any other unforeseen conditions. 

Phase II Project Schedule

Phase II work will begin in October 2013 and be completed in November 2013, barring inclement weather or any other unforeseen conditions. Exact dates are subject to change. Some streets will require a two-step resurfacing process and other streets will require only one step:

Step 1:

  • Click here for the project schedule and map for Step 1 of Street Resurfacing in Area 3, October 15th-16th, 2013
  • Click here for the project schedule and map for Step 1 of Street Resurfacing in Area 5, October 14th-17th, 2013

Step 2:

  • Click here for the project schedule and map for Step 2 of Street Resurfacing in Area 3, October 18th and 21st, 2013
  • Click herefor the project schedule and map for Step 2 of Street Resurfacing in Area 3, October 24th, 25th, and 28th, 2013 *REVISED
  • Click here for the project schedule and map for Step 2 of Street Resurfacing in Area 3, October 29th, 31st, and November 1st, 2013 *REVISED
  •  Click here for the project schedule and map for Step 2 of Street Resurfacing in Area 3, November 4th – 11th, 2013 *REVISED
  •  Click here for the project schedule and map for Step 2 of Street Resurfacing in Area 5, October 17th-22nd, 2013
  • Click herefor the project schedule and map for Step 2 of Street Resurfacing in Area 5, October 23rd-28th, 2013 *REVISED
  • Click here for the project schedule and map for Step 2 of Street Resurfacing in Area 5, October 30th – November 1st, 2013*REVISED
  • Click here for the project schedule and map for Step 2 of Street Resurfacing in Area 5, November 4th - 11th, 2013 * REVISED
  • Click here for the project schedule and map for Step 2 of Street Resurfacing in Whitley Collins and Miraleste Plaza/Via Canada areas, October 30th, 31st, and November 6th, 2013

For Further Information

Please feel free to contact the Public Works Department at 310-544-5252 or publicworks@rpv.com with any further questions. You may also subscribe to the list serve and receive periodic updates on the project status via email by joining the list server group here.

 
WASTE REMOVAL / RECYCLING
Waste Removal
Recycling Programs
HHW/E-Waste
Conservation Programs
TRAFFIC
Traffic Calming Guidelines
Traffic Alert System
Traffic Commission Quick Links
CONTACT/COMMENT
Report a Non-Emergency Service Request
Submit a Comment
Join the Listserv

Click on the icon
to download Adobe Reader